Cross

spacer

btt
crossgroup

Project History

Kerr Mcghee,  Ticondaroga Project
( Lucker Model JS 1500 )
Riser Installation, 5,250’ water depth

Kerr Mcghee,  Red Hawk Project
( Lucker Model JS 1500 )
Riser Installation, 5,310’ water depth

BP, Well Abandonment
( 2 - Hepburn Model Winches )
100’ – 250’ Water depth

Aker Kerverner, Neptune Project
( Hepburn Model Winch )
Umbilical Installation,
4,000’ water depth

Viola Inc. Mat Installation
( SKAGIT Model ETW-300 )
9,000’ water depth

Shell, Numerous Tree and
Tubing Head Spool Installations
( Skagit Model ETW -300 )
@ various water depths

G&C Construction, Colorado Mountains
( SKAGIT Model ETW-300, Hepburn Model Winch )
36” Gas line installation.
7,400’ above sea level

Diamond Offshore, Tree Installation
( Hepburn Model Winch )
800’ water depth

Apache Offshore, Tree Installation
( Hepburn Model Winch )
800’ water depth

Dragados Offshore (Mexico)
( 2 - MARKEY Model DES-26 )
Jacket load out to barge for transport

F.M.C. Inc., Spooling and Jumper Installation
( 75 kip spooling machine )

Shell, Gas Line deployment Colorado
( 2- 75 kip spooling machines )
100’ sub terrain

Hillcorp, Pipeline Installation
( Skagit Model AED 296, Hepburn Model Winch )
80’ water depth

Superior Offshore, Mat Installation
( MARKEY Model DES-26 )
5,000 water depth

M & H Engineering
(Hepburn) Straighten bent Kason
150’ water depth

Exxon, CCC Mexico Nitrogen Line Pull
( SKAGIT Model ETW-300)
Pulled 9,000’ of 72’’ Nitrogen line from barge to bank

Shell Oil, Serrano, Oregano Jumper Installation
SKAGIT Model ETW- 300 )
Set Sub-sea Tubing head Spools, Trees and Jumpers.
4000’ water depth

Stolt Offshore
( MARKEY Model DES-24 )
Sub-Sea tool Installation and Retrieval

Sub Sea 7, Aspen Project
( MARKEY Model DES-24, SMATCO Model 84 )
Pipeline and Umbilical Installation

AGIP GC254
( MARKEY Model DES-24 )
Remove and Replace Generator

Coflexip Stena Offshore
( MARKEY Model DES-26 )
Nanson Spar Flow Line Installation

Willbros Argentina Project
( 2 HEPBURN Model Winches )
Barge Pipeline Pull

Stolt Offshore, Barge Certification DB 801
( Crossmar, Inc. Rigging Department )
990 Ton Certification Lift

Global, Isreal Project
( SKAGIT Model ETW- 300 )
Pipeline Pull to Beach

Saipem, Canada Project – Umbilical Installation
( Gearmatic 29, 10k spooling machine )

Oceaneering, Princess
( MARKEY Model DES-24 )
Mud Mats 2,800’ water depth

Oceaneering, Spinnaker Sangreia
( MARKEY Model DES-24 )
Plet Installation

Oceaneering, Habanero Project, Mat Installation
( HEPBURN )
5,500 ’ water depth 

Oceaneering and BP, King West Jumper Installation
( SKAGIT Model ETW- 300 )
5,000 ’ water depth 

AGIP, King Kong, Pipeline Installation
( SMATCO Model 84-DPS-100 )
4,100 ’ water depth

Shell Oil, Thunder Horse , Tubing Head Spool
Installation ( SKAGIT Model ETW- 300 ) 4,600 ’ water depth

Mc Dermott Inc., Kerr McGee, BoomVang.
( 2 MITSUBISHI Model 147 )
Mooring Line Installation
4,600 ’ water depth

Oceaneering, Zia Project, Mat Installation
( MARKEY Model DES-26 )
3,500 ’ water depth

Stolt Offshore, Gulfstream
( SKAGIT Model ETW- 300 )
Pipeline Installation,
880’ water depth 

Cal Dive, Exxon Diana Jumper Removal and
Pressure Cap Installation

( MARKEY Model DES- 26 ) 
4,700’ water depth

Stolt Offshore, Gulfstream
( MARKEY Model DES- 24 )
Spool Piece Installation
700 ’ water depth

Shell Deepwater, Popeye and Manatee
( SKAGIT Model ETW- 300 )
Sub-sea component Installation.
Tubing head spools, trees 4,600’ water depth 

Hereema, Horn Mountain, Kley France  
( 150 Ton Linear Winch, Back Tension Machine )
Retrieved messenger wire with attached chain to lock in chain  jacks and spar. 
5,000’ water depth

Saibos – Thunder Horse 
( 75 kip spooling machine )
Retrieved synthetic buoy line
5,500’ water depth 

Oceaneering, Surveying Titanic Site
( SMATCO Model 84-DPS-100 )

Global Industries, Pipeline Abandonment and
Recovery
Mexico
( SKAGIT Model ETW- 300 )
Various water depths

Cal Dive, Pipeline Abandonment and Recovery
( SKAGIT Model ETW- 300 )
Various water depth

Oceaneering, Recovery Operations
( SKAGIT Model ETW-300, MARKEY Model DES-26 )

Stolt Offshore, Dole Jumper Installation
( SMATCO Model 84-DPS-100 )

Stolt Offshore, Marshall Madison
( MARKEY Model DES-26 )
Jumper Installation and Umbilical Landing

Exxon, Mica, Jumper Installation
( MARKEY Model DES-24 and SMATCO Model 84-DPS-100 )
Umbilical Landing to platform

Stolt Offshore, Auger Expansion
( SMATCO Model 84-DPS-100 )
Umbilical Installation

Stolt Offshore, Ursa Umbilical Installation
( SMATCO Model 84-DPS-100 )

NSW Submarine Systems, Abandonment and Recovery
( MARKEY Model DES-26 )

Stolt Offshore, Dole Jumper Installation
( MARKEY Model DES-24 ) 1500’ water depth

Stolt Offshore, Gulfstream Jumper Installation
( SKAGIT Model ETW-300 )
Supplied Pipe-lay Plow and Cover Winches

Stolt Offshore, Boomvang 
( SKAGIT Model ETW-300 )
Abandonment and Recovery

Chevron, Typhoon Umbilical, and Flow Line
( SMATCO Model 84-DPS-100 )
Landed Umbilical and Flow lines to TLP.
3000’ water depth

Exxon, Diana Flow Line Connections
( MARKEY Model DES-26 )
Completed Flow line connections to the Sphar Structure.
4100’ water depth

AGIP Oil and Gas, Jumper Installation
( MARKEY Model DES-24 )

Stolt Offshore, Lady Bug Jumper Installation
( MARKEY Model DES-24 )
2000’ water depth

Shell Oil, Europa Jumper and Tree Installation
( SKAGIT Model ETW-300 )
Set Sub-sea Tubing head Spools, Trees and Jumpers.
3700’ water depth

Shell Oil, Crosby Jumper and Tree Installation
( SKAGIT Model ETW-300 )
Set Sub-sea Tubing head Spools, Trees and Jumpers.
2400’ water depth

British Petroleum, Marlin Umbilical, and Flow Line
( LUCKER Model 1500 Linear Winch, MARKEY Model DES-26 )
Landed Umbilical and Flow lines to TLP.
3200’ water depth

Shell Oil, Europa Pipeline Installation
( SKAGIT Model ETW-300, SMATCO Model 84- DPS-100)
Two Pipelines Installed on the Jim Thompson

Shell Oil, Salsa J-Tube Pull
( SKAGIT Model ETW-300, LUCKER Model JS-1500 )
Phase (1) and Phase (2) J-Tube Pull

Shell Oil, Macaroni Jumper and Tree Installation
( SKAGIT Model ETW-300 )
Set Sub-sea Tubing head Spools, Trees and Jumpers.
3700’ water depth

Texaco, Gemini Jumper Installation
( SKAGIT Model ETW-300 )
Installed (3) well jumpers on the Ocean Starr-
3,200’ water depth

Shell Oil, Bullwinkle J-Tube Pull
( LUCKER Model JS-1500 Linear Winch )
Two J-Tube Pulls on the Bullwinkle Platform for Allseas

Mariner Energy, Pluto Jumper Installation
( MARKEY Model DES-26 )
Installed Jumper on the Transocean
3,200’ water depth

Exxon, Heritage J-Tube Pull
( LUCKER Model JS-1500 Linear Winch )
J-Tube Pull- 1,200’ water depth

Amerada Hess Pipeline Tow
( MARKEY Model DES-26 )
Pipeline Tow

Shell Oil,  Macaroni Pipeline Installation
( SMATCO Model 84-DPS-100 )
Two Macaroni Pipelines installed on the Richardson

British Petroleum Pipeline Project, Troika
( INTERCON Model 78410 )
Pipeline Tow- 3,400’ water depth

Shell Oil, Cinnamon Project, Gas, and Oil Pipeline Installation
( SKAGIT Model ETW-300 ) Installed 6” and 8’’ Pipeline on the Enchilada Platform

Alcatel Kabel Norge Umbilical Installation
( MARKEY Model DES-26 )
Umbilical Installation-  3,600’ water depth